42%
Faster creative delivery timelines
~50%
Reduction in time-to-market
2x
Designer productivity, from 2 to 3-4 creatives a day
1.
The brand needed a large volume of creatives every month, nearly 200, each requiring multiple channel versions.
2.
Even simple emailers with adapts were taking 3–4 days to turn around.
3.
Slow delivery was holding up campaign rollouts and creating operational bottlenecks for the team.
ConvergenSEE enabled the brand's content operations through CreateIT, bringing structure and consistency to how creatives were planned, produced and delivered.
Introduced clearer briefing formats to reduce rework, and streamlined workflows across creation, adapts, feedback and approvals.
Reduced dependency on manual coordination between teams, and established a scalable production process that supported high-volume content needs.
33%
Reduction in creative resource requirement
Content at scale
200
Creatives a month, each with multiple channel versions, delivered without bottlenecks
CreateIT